Skip to main content
La Ferme Urbaine

Greenhouses · 7 min read

Price of a hydroponic greenhouse in Tunisia

Updated on July 22, 2026

“How much does a hydroponic greenhouse cost?” is every project owner's first question. The honest answer: it depends on the size, the land and what is included. That is why our greenhouses are quoted on request. This article explains what a turnkey offer covers.

What a turnkey offer includes

A turnkey offer goes beyond the structure. It includes the greenhouse, the NFT system, the hydraulic circuit, assembly and electrical installation, transport, and initial training. Comparing a turnkey offer with a simple equipment batch therefore makes no sense — see the details on our hydroponic greenhouses.

  • A greenhouse structure sized for your surface area.
  • An NFT system installed and calibrated.
  • Hydraulic circuit and electrical installation.
  • Transport and on-site assembly.
  • Initial training in crop management.

Prices set on quote

All our greenhouses — from the 200 m² greenhouse to the larger 500 m² greenhouse and 1000 m² greenhouse, and bespoke projects — are priced on quotation.

Investment support

Agricultural investment support schemes may be available depending on project eligibility. Our team can assist with the preparation of the application. We cover this topic in our article on APIA.

Where to find the detailed estimates

The detailed production, operating-cost and profitability estimates are in each model's brochure, which you can download from our hydroponic greenhouses. To understand the factors to review, read our article on the profitability of a hydroponic greenhouse.

Frequently asked questions

Why aren't prices displayed?

Because they depend on the project: the price is set on quote, according to the land and options.

Does the quote account for investment support?

Support requires a separate application, subject to project eligibility; we can assist you in preparing it.

Are transport and assembly included?

Yes: the turnkey offer includes transport and on-site assembly, in addition to the structure and equipment.

What should I plan for after installation?

Running the greenhouse (follow-up, electricity, water). Detailed estimates are in each model's brochure; training and follow-up are part of the offer.

Does the quote vary by crop?

The structure and NFT system are similar; it is mainly the size and project options that change the quote.